Wow, they're getting this house up quickly!
Also, we got the blessing to run our own structured wiring, so on this next set of off days, I'll be doing that.
So Far:
Foundation - check.
Framing - check.
Roof - check.
Windows - check.
Plumbing for water & sewer - check.
Plumbing for gas - check.
Electrical - check.
Things to do:
Structured wiring
Doors
Insulation
Sheetrock
Brick work
Electrical fixtures
Bathroom fixtures
Wednesday, March 27, 2013
Tuesday, March 26, 2013
More New House Pictures
Trying to get up as many of the house pictures as possible. It's going up FAST!
I apoligize for putting so many up at once and duplicating ones we've already posted. We are so excited to see how quickly it's progressed!
These are pics we took the day we signed the
contract. They had just poured the foundation!
March 8th
Framing going up!
Mason found his room already!
Picture above: Thomas caught on the stairs
Right: the rafters going up!
Josh is already sizing up the crawlspace for something!
Above: a view into my future kitchen
Right: Looking out the front door
The spot the fireplace will be.
Right: Thomas found a pencil, he's writing his name in his closet! LOL
First picture of siding being installed.
Bathtub in the kids bathroom
I believe this is facing the back wall of the gameroom
Plumbing
I don't know why I took a picture of the staircase, but I like it =)
This is a plumbing manifold which controls all the water in the house. If Josh needs to replace a sink, he can turn off the water to just that bathroom instead of the whole house.
Water heater...
Double Hung Windows!
This is the plumbing manifold after it was hooked up and the water lines are ran!
Back of the house has been completely sided!
Even in the rain, they are working! Yay for having it up before a big storm came through!
Duct for the oven
The base for the master bath shower
Laundry room hookups
These were taken March 25th after baseball practice. The AC guys were still working when we left!
I apoligize for putting so many up at once and duplicating ones we've already posted. We are so excited to see how quickly it's progressed!
These are pics we took the day we signed the
contract. They had just poured the foundation!
March 8th
Framing going up!
Mason found his room already!
Picture above: Thomas caught on the stairs
Right: the rafters going up!
Josh is already sizing up the crawlspace for something!
Above: a view into my future kitchen
Right: Looking out the front door
The spot the fireplace will be.
Right: Thomas found a pencil, he's writing his name in his closet! LOL
Bathtub in the kids bathroom
I believe this is facing the back wall of the gameroom
Plumbing
I don't know why I took a picture of the staircase, but I like it =)
This is a plumbing manifold which controls all the water in the house. If Josh needs to replace a sink, he can turn off the water to just that bathroom instead of the whole house.
Water heater...
Double Hung Windows!
This is the plumbing manifold after it was hooked up and the water lines are ran!
Back of the house has been completely sided!
Even in the rain, they are working! Yay for having it up before a big storm came through!
First signs that we have an AC
Duct for the oven
The base for the master bath shower
Laundry room hookups
These were taken March 25th after baseball practice. The AC guys were still working when we left!
Subscribe to:
Posts (Atom)